Renovation Vacation

Now that our holidays have started it is time to really get cracking. We move in to the house in 3 weeks, so we need to make the inside a little bit more livable. We have prioritised one room downstairs which will be our temporary bedroom so we have done a quick paint job and thrown in some cheap floorboards. All experienced renovators tell us a fresh bedroom is REALLY important, so we have listened.

Sometimes it feels overwhelming, but we just need to keep focused and take it one step at a time.

Check out the photos of our progress:

The temporary bedroom:

Before:

IMG_3333

 

Is Fredrik renovating or Breaking Bad with Heisenberg? IMG_3492IMG_3495

It is a bit hot in plastic overalls:IMG_3498

Filling up the holes:

IMG_3579A coat of paint:bild (5)Floorboards in:
bild (3)

Just some skirting boards left and we can sleep in here… oh… and a new light!!

Some other happenings on the constructions site have included:


Deliveries galore from Beijer:IMG_3565

A much anticipated bin, the amount of rubbish is just ridiculous! IMG_3575


Fredrik aka McGyver decided to make it easier to get stuff in the bin so instead of walking down the stairs, he constructed this little platform for us to throw the rubbish from. The boy is a genius.IMG_3581

 

We’ve also began demolishing upstairs ready for our living area:IMG_3580IMG_3589IMG_3203

A Swede and a Sledge Hammer

Today we had Nina over to show her the house and she was pretty keen to get in to some demolition, so we let her loose on the downstairs area. This room we are doing a quick tidy up with a coat of paint and floor boards so we have a relatively fresh room to sleep in when we first move in, until our bedroom is ready.

So we started with this room:IMG_5734

Carefully removed the skirtings first:IMG_3324

Then Nina got hold of this:IMG_3321

And this happened:

IMG_3327 IMG_3328

I also had a bit of a go at it: 

Once the wardrobe was out, we began to remove the disgusting orange carpet only to uncover some tiles which look like they are brand new!

IMG_3331 IMG_3333

It was a pretty fun day and anyone who messes with me… I have Nina on my team, watch that video of her with that sledge hammer… be afraid! After photos coming soon!

Removing Supporting Wall: Support Beam

Today we had to take on probably one of the toughest, most risky projects, we had a 9 metre support beam lifted in to a hole in the side wall of the house. As we wish to remove a semi-supporting wall we need to add a beam in the attic to support the roof, otherwise we might wake up one night with the roof on us… so here is the story…

On Friday, this truck from Beijer Byggmaterial (shameless advertising for Sweden’s best building supplies store with the most awesome employees ;-)):

 

IMG_3122

Delivered us this beam…

IMG_3119

Unfortunately that truck was too small to lift the beam, as it needed to be lifted around 20 metres from the road to the house and up around 12 metres which a standard crane truck can’t do… So we called in the big guys. Per and his somewhat larger crane truck…IMG_4893 (1)

 

At this point I left the site and let David take over. I felt like this was dangerous and risky and was really glad to get out of there! Here is what happened next….

Some precision crane driving (I think it took only 2 attempts), lifted the beam flat to the hole which Fredrik had cut from the facade.

IMG_4896

David was outside guiding it in to Fredrik who was in the attic pulling the 180kg beam in to the attic.

 

 

 

IMG_4897

IMG_4898

IMG_4899

 

All three of them then pulled the full beam in to the attic where we will soon secure it in place so we can remove the wall.

 

IMG_4901

I then could return to the site to see the beam safely in the attic ready for my new floorplan to start to come in to shape.

 

 

photo (3)

Let the demolition begin! 🙂

More Before and After Photos

Today we worked a bit more clearing out the garden before it began to pour rain.  Fredrik even let me use the big grass trimmer… he was a bit hesitant because it is actually bigger than I am. After the rain started we headed inside and started to take down some of the wooden paneling etc in preperation for removing the wall this week. Tomorrow we will begin the stressful task of having a crane lift the supporting beam in to the attic to support the roof after the wall is removed. Photos of that to come… wish us luck! 🙂

 

Before:

IMG_5923IMG_5924

 

After:

 

IMG_3212IMG_3213

 

Before:

 

IMG_5910IMG_5913IMG_5916IMG_5918IMG_5919

 

After :

IMG_3207

 

 

IMG_3209

 

IMG_3211

Amanda with her new favourite tool! 🙂

bild

 

We bought a house!

305208_10151320727475474_2081574322_n

March 28th, 2013 Fredrik and I took a massive step, we bought our first home. Sure, it is not our dream home, but we decided to try to enter the market at an affordable level and not get in to debt up to our eyeballs. We wanted something we could renovate that was in a good area, with good transport in the town. The market is down right now, so it is a buyers market and we think we got quite a bargain and think it will pay off in time.

With Fredrik’s skills and connections we thought it could be a great project for us an opportunity to create something awesome and showcase our skills. We have a little renovation experience from renovating a boat in 2012, which we plan to have completely finished by the time we move in. We really like working together and think we are a good team, Fredrik can build just about anything and I am the one who is planning, budgeting and trying to keep things on track. Some might say I am the boss (or b*tch… it depend who you ask).

The structure of the house is in good shape, it is build in the 50’s and the layout is very closed and old fashioned, plus it is WAY too brown and the wood panels make me quiver. We have big plans… WATCH THIS SPACE.

We get the keys on June 31st, so our next few blog posts will be about our plans. Then once we get the keys, the real blogs will start, we hope to share the transformations, how to’s, ups and downs. There will be plenty of drama to share, everyone who knows me is expecting that!!

About the house:

Built: 1959

Size: 150 m2

Land size: 1352 m2

Location: Stenkullen, Lerum. A suburb outside Gothenburg, Sweden. 20 minutes commute in to the city centre.

44PAHULNH282S3A1 44PAHUIHD282S38P 44PAHUDPF282S37B 44PAHU0NB282S34K 44PAHTRGN282S33C 44PAHTNBR282S323 44PAHTJRF282S30M 44PAHTEIF282S2VD 44PAHTADJ282S2U5 44PAHT20V282S2RE 44PAHT6EJ282S2ST 44PAHSTFR282S2Q6 44PAHSPKN282S2OP 44PAHSFHP282S2NB 44MID25IOFNF4E76 44MBK2FH7OLI4SDG