We have had a bit of downtime since Christmas when it comes to the remodel, and I think that is really important otherwise I think this project would drive us mad and it is probably the best advice experienced renovators have given us… take breaks! After coming back from the US and Mexico where we had an awesome holiday we struggled to get our mojo back, but with the new season of The Block being released we have suddenly found our motivation again and it feels really good.

Now we have finally started to get the plaster on the walls upstairs, the kitchen is getting ordered this week and the new windows for downstairs. Pretty glad that Spring has come early this year as it means we have a bit more time to some of the boring stuff like drainage around the house.

We sometimes forget how much progress we have made, but here is something that really shows it. Below is a photo of how the upstairs living area was before, this is it when we moved in, it was three rooms:

IMG_5764

This is it now… it is one amazing room with ceiling window, spotlights, new walls, new heating…. it is virtually a completely new house:

Remodel new plaster

This doesn’t happen all by itself… here are some progress shots:

New Gyprock New Plaster board IMG_5728 Electricity remodel Amanda spackel Remodel Plastering Wall Renovating plastering wall Spackel Amanda Remodel Plaster

 

We have also done a rough renovation of the room I used to call ‘the crime scene’ as it was pretty damn gross! It is amazing what a coat of paint can do!

Before:

IMG_5709

After:

Renovated basement

Open plan living area

Finally, the wall is all down. In just 1 hour today we turned two bedrooms and a living area in to an open plan space which will be the new kitchen and living area. It feels massive now, super excited that the master plan is starting to become a reality. I can’t wait until we raise the ceiling and put in the ceiling windows… it is going to look amazing!

Here is a video of our demolition, you can see the before, during and after. 1 hour of work in 2 minutes…

And the wall begins to fall….

Today we were busy little bees! We had some helpers from Västervik in the form of Fredrik’s Mum and Brother. The extra muscle definitely made a difference today, the wall is only about half way down and OMG does one wall result in a LOT of wheelbarrows full of rubble! I started off by cleaning out the room where the heating pump is currently located as tomorrow the removal of this pretty thing in the pic below is happening. Is it only me or does this look like something from a horror film?

IMG_3599

Otherwise… this is pretty much what happened today summed up in to a 10 second film:

The outcome?

IMG_3602 IMG_3605 IMG_3622 IMG_3631

Removing Supporting Wall: Support Beam

Today we had to take on probably one of the toughest, most risky projects, we had a 9 metre support beam lifted in to a hole in the side wall of the house. As we wish to remove a semi-supporting wall we need to add a beam in the attic to support the roof, otherwise we might wake up one night with the roof on us… so here is the story…

On Friday, this truck from Beijer Byggmaterial (shameless advertising for Sweden’s best building supplies store with the most awesome employees ;-)):

 

IMG_3122

Delivered us this beam…

IMG_3119

Unfortunately that truck was too small to lift the beam, as it needed to be lifted around 20 metres from the road to the house and up around 12 metres which a standard crane truck can’t do… So we called in the big guys. Per and his somewhat larger crane truck…IMG_4893 (1)

 

At this point I left the site and let David take over. I felt like this was dangerous and risky and was really glad to get out of there! Here is what happened next….

Some precision crane driving (I think it took only 2 attempts), lifted the beam flat to the hole which Fredrik had cut from the facade.

IMG_4896

David was outside guiding it in to Fredrik who was in the attic pulling the 180kg beam in to the attic.

 

 

 

IMG_4897

IMG_4898

IMG_4899

 

All three of them then pulled the full beam in to the attic where we will soon secure it in place so we can remove the wall.

 

IMG_4901

I then could return to the site to see the beam safely in the attic ready for my new floorplan to start to come in to shape.

 

 

photo (3)

Let the demolition begin! 🙂